Case Studies
Renewable energy turbine manufacturer
0 rejects in 18 monthsChallenge
Required a new supplier for complex turbine housings with 2-week lead times.
Solution
Dedicated a 5-axis cell with pre-staged material and prioritised scheduling.
Result
Delivered 100% on time across 18 months with zero non-conformances.
Tier 1 aerospace components supplier
-28% unit costChallenge
Needed to reduce unit cost on high-volume brackets without compromising quality.
Solution
Re-engineered fixturing and optimised tool paths to reduce cycle time by 35%.
Result
Unit cost reduced 28% with identical quality metrics.
Could your business be next?
Let's discuss how we can deliver similar results for you.