Case Studies

Renewable energy turbine manufacturer

0 rejects in 18 months

Challenge

Required a new supplier for complex turbine housings with 2-week lead times.

Solution

Dedicated a 5-axis cell with pre-staged material and prioritised scheduling.

Result

Delivered 100% on time across 18 months with zero non-conformances.

Tier 1 aerospace components supplier

-28% unit cost

Challenge

Needed to reduce unit cost on high-volume brackets without compromising quality.

Solution

Re-engineered fixturing and optimised tool paths to reduce cycle time by 35%.

Result

Unit cost reduced 28% with identical quality metrics.

Could your business be next?

Let's discuss how we can deliver similar results for you.

Start a Conversation